Repair work of Pamban Bridge under full swing

Rameswaram (Tamil Nadu), Dec 07 (ANI): Repair work of Pamban Bridge is under full swing after a fissure was noticed on December 4. All trains to Rameswaram from various parts were cancelled. Test runs are being conducted.

Watch the Video below

Ventuno